Hello, a choice had to be made and the layout is no more. I have decided to redesign the space and replace the existing layout with an On30 layout that incorporates the On30 modules. Untill I can find the time to resign this space, please pop over to the On30 page I have set up. https://www.facebook.com/snaggletooth.railway
Cheers,
Peter
Friday, February 19, 2016
Wednesday, February 11, 2015
Documentary of the layout by Chris Lyon
Hello all,
Chris Lyon stopped by to shoot a documentary of the layout. Chris is well know for his videos on layouts and modeling tips. His Youtube channel is under CNLVN.

Thanks Chris.
Cheers,
Part 1: Tour of the layout
Part 2: Tours, Ops and more
Part 3: A six year olds perspective on model trains
Chris Lyon stopped by to shoot a documentary of the layout. Chris is well know for his videos on layouts and modeling tips. His Youtube channel is under CNLVN.

Thanks Chris.
Cheers,
Part 1: Tour of the layout
Part 2: Tours, Ops and more
Part 3: A six year olds perspective on model trains
Saturday, January 24, 2015
An On30 kit build
This is the first completed rolling stock in On30. A nice reefer kit from on30ima.com The Devil's Brew will be produced at a proposed distillery on the On30 layout.
Monday, October 20, 2014
Goodbye pink foam.
Yes it is true, even more pink foam has disappeared. Work has progressed on the lumber yard, yard and some forest area.
Thursday, September 18, 2014
Working on the yard.
Laid some of the last track and installed the turn table and roundhouse. Still need to finish painting the turn table and details on the roundhouse. Also finished the lumber yard main building. Again, details in the future.
Monday, April 21, 2014
Another quick photo update
Viiew of the new yard
View of the yard lead over the swamp
View of the intermodal terminal
View of the chemical factory
Saturday, April 19, 2014
New Backdrops
Hello,
I have added some backdrops to the HO layout. They really improved the layout adding both interest and depth. Here are some shots of Snaggletooth River, Vulcan and the new Yard.
I have added some backdrops to the HO layout. They really improved the layout adding both interest and depth. Here are some shots of Snaggletooth River, Vulcan and the new Yard.
Hexenkessel Chemical plant update
Hello,
I have been doing some scenery work on the chemical plant. Slowly working my way back towards the yard. This blog needs a lot of updates and some things re-done, including the track plan, which finally, is finalized. In the meantime, enjoy the update photos. One thing you will see is the fact that backdrops have been put in place, which I must admit has added a lot to the layout.
I have been doing some scenery work on the chemical plant. Slowly working my way back towards the yard. This blog needs a lot of updates and some things re-done, including the track plan, which finally, is finalized. In the meantime, enjoy the update photos. One thing you will see is the fact that backdrops have been put in place, which I must admit has added a lot to the layout.
Tuesday, March 11, 2014
So some progress is being made. The yard is laid and wired and all track is 95% laid. I still have the turntable, caboose storage and work train storage tracks ad well as the engine terminal but all main line and the yard is down. Right now I am working on finishing the scenery at the chemical plant so I can focus on the new bits. Eventually I will revamp and clean up this whole site. Until then, some photos. Cheers,
Peter.
Friday, November 29, 2013
It has been a while...
But I have not been idle.
Read my latest update here http://sld-nmra.ca/mail_car/mail_car.htm
I have also started work on the On30 modules. I am taking this one a little slower than I did with the HO, not that building the HO version was done in 7 days. In fact I have just finished the last 8 feet of bench work. With the On30 modules being much smaller in scope I am planning to do more scratch building and much more planning before setting out.
Well a small update but an update none the less.
Read my latest update here http://sld-nmra.ca/mail_car/mail_car.htm
I have also started work on the On30 modules. I am taking this one a little slower than I did with the HO, not that building the HO version was done in 7 days. In fact I have just finished the last 8 feet of bench work. With the On30 modules being much smaller in scope I am planning to do more scratch building and much more planning before setting out.
Well a small update but an update none the less.
Monday, May 6, 2013
Snaggletooth River Module - a new life
Well, the time has come to retire Snaggletooth River from a life on the road. I noticed this past weekend at Ottawa Train Expo that the scenery was looking a little tiered. That said, I have also decided how I would turn the corner.
Friday, March 15, 2013
Tuesday, November 27, 2012
Sunday, May 27, 2012
New info in pages
Hello,
Getting back to it. Added some new information in the "Pages" section as well as a new track plan. Slowly things are getting there. Cheers.
Sunday, April 15, 2012
Working on the train room
I have been taking the time to "finish" the train room. Although my lighting situation could use some work, the walls had priority.
As you can see in the photos I have painted the walls a soft blue and added wall brackets. I can do this as the modules are light.
Subscribe to:
Posts (Atom)





















